Luxist Web Search

Search results

  1. Results From The WOW.Com Content Network
  2. Railway track - Wikipedia

    en.wikipedia.org/wiki/Railway_track

    As an alternative to the insulated joint, audio frequency track circuits can be employed using a tuned loop formed in approximately 20 m (66 ft) of the rail as part of the blocking circuit. Some insulated joints are unavoidable within turnouts.

  3. Track circuit - Wikipedia

    en.wikipedia.org/wiki/Track_circuit

    A rail break between the insulated rail joint and the track circuit feed wiring would not be detected. Failure modes that result in an incorrect "track clear" signal (known usually in the US as a "false clear") may allow a train to enter an occupied block, creating the risk of a collision. Wheel scale and short trains may also be a problem.

  4. Rail stressing - Wikipedia

    en.wikipedia.org/wiki/Rail_stressing

    For example, the CRT may be reached due to a removal of a rail section or an Insulated Block Joint (IBJ). A stressing engineer measures the rail section to be removed and places indicators with marks on the foot of the rails. After the rail section is cut out, its first stress free temperature is determined.

  5. Double junction - Wikipedia

    en.wikipedia.org/wiki/Double_junction

    Double junction, or level junction (left hand running). A double junction is a railway junction where a double-track railway splits into two double track lines. Usually, one line is the main line and carries traffic through the junction at normal speed, while the other track is a branch line that carries traffic through the junction at reduced speed.

  6. Signaling of the New York City Subway - Wikipedia

    en.wikipedia.org/wiki/Signaling_of_the_New_York...

    A signal in the Flushing–Main Street station. Most trains on the New York City Subway are manually operated. As of 2022, the system currently uses automatic block signaling, with fixed wayside signals and automatic train stops. Many portions of the signaling system were installed between the 1930s and 1960s.

  7. Axle counter - Wikipedia

    en.wikipedia.org/wiki/Axle_counter

    Axle counter. An axle counter is a system used in railway signalling to detect the clear or occupied status of a section of track between two points. The system generally consists of a wheel sensor (one for each end of the section) and an evaluation unit for counting the axles of the train both into and out of the section.

  8. New Canaan Branch - Wikipedia

    en.wikipedia.org/wiki/New_Canaan_Branch

    The work entails replacing 8,000 rail ties, 1,600 feet (490 m) of rails, and insulating rail joints. Repairs will also be made to mud spots, drainage and rail anchors, along with replacing bridge timbers on the Noroton River Bridge and resurfacing the entire line.

  9. Signalling block system - Wikipedia

    en.wikipedia.org/wiki/Signalling_block_system

    A block instrument on the Midland Railway. Signalling block systems enable the safe and efficient operation of railways by preventing collisions between trains. The basic principle is that a track is broken up into a series of sections or "blocks". Only one train may occupy a block at a time, [1] and the blocks are sized to allow a train to ...